奉天医院
FENGTIAN HOSPITAL
中心医院新建与改造项目
沈阳奉天医院新的总体规划将新建筑融入到不断成长扩大的建筑环境结构之中,并为未来发展扩建创造了空间。通过为医生、病人和访客设计各自的通道,医院的内部流程也得到了优化。
一期工程建成了由两部分组成的14层住院大楼及一幢4层高功能性建筑。二期工程完成了门诊、检查和治疗区的改造及大厅的新建工作。
病区大楼的病房基本朝东。各科病区共占八层,每层设两个科的病房。共有病床1200张,分为单人、双人及四人病房。
当然,所有办公室都有可独立开启的窗户, 以便自然通风, 并且窗户都附有遮阳装置。大楼的铝合金玻璃幕墙令建筑散发出一丝温暖气息。
业主 沈阳医院
竞标 2006年
竣工时间
一期工程:新建,2010年
二期工程:改造/大厅新建,2012年
建筑数据
一期工程:建筑面积80000m2
二期工程:建筑面积27000m2
Fengtian Hospital
New construction and renovation of a primary care hospital
The new master plan for Fengtian Hospital in Shenyang integrates the new buildings into the existing complex and creates space for future developments. At the same time, internal procedures were optimized through separate circulation routes for doctors, patients and visitors.
The two-part, 14-story ward high-rise and a 4-story functional building were built in the first phase. The renovation of outpatient, examination and treatment areas took place in a second phase, during which the new entrance hall was also built.
The patient rooms in the ward high-rises are primarily oriented toward the east. The wards extend over eight levels, each housing two wards. In total, 1,200 beds are available in rooms for one, two and four patients.
Individually operable windows equipped with sun protection devices naturally ventilate all workspaces. The aluminum and glass façade of the wards imparts a warm aura to the buildings.
Client: Shenyang Hospital
Competition: 2006
Completion
Phase 1: New construction, 2010
Phase 2: Renovation/ new entrance hall construction, 2012
Building data
Phase 1: 80,000 m² GFA
Phase 2: 27,000 m² GFA